Village of Surfside Shoreline Protection

Surfside Beach, Texas

Village of Surfside Shoreline Protection, TX
Surfside Beach Nourishment

Surfside Beach Nourishment

Coast & Harbor Engineering designed a revetment which was constructed along Beach Drive in 2008 just prior to Hurricane Ike. While the revetment received severe damage, it protected Beach Drive, the public water and wastewater systems, and also blunted the force of the storm surge that swept other neighborhoods in the area clean. In 2011, CHE performed a conditions assessment, designed the repair and enhancement of the revetment, and designed and oversaw the construction of the beach nourishment project that placed 140,000 cubic yards of sand along the shoreline. 

Project Contact: Hugo Bermudez, PE, (512) 342-9516 or hugo@coastharboreng.com.