Chavyo Beach Tow-Out Facility

Sakhalin Island, Russia

Chayvo Beach Tow Out Facility
Chayvo Beach Project Construction

Chayvo Beach Project Construction

Coast & Harbor Engineering provided navigation channel design, sedimentation analysis, dredged material fate determination, and construction oversight services for Exxon Neftegas Limited Partnership as part of the temporary offloading facility dredging and self-lift operation. To operate for the gas production module sea-lift, the offloading facility’s basin needed to be dredged and maintained with a barge pad for the duration of the module offloading. Along with material removed for a barge access channel, all of the dredged material was placed on the adjacent shoreline to provide temporary wave protection to reduce dredging during the maintenance phase.


Project Contact: Vladimir Shepsis, PE, (425) 778-6733 or vladimir@coastharboreng.com.